What's New On Tom's Travel Blog?

Links to Linda's Photo Pages Have Been Added!
See The List On The Left


Almost all photos on this blog come from our Flickr Page. You can go directly to our Flickr photo sets by following this link. It's the easiest way to navigate our on-line photos.


Showing posts with label Construction. Show all posts
Showing posts with label Construction. Show all posts

Wednesday, March 26, 2025

The Adventure Named Egypt!

Devoted followers of this blog, and there aren't very many, are probably wondering what has been going on over the past few weeks.  We headed south for that cruise on Lake Nasser back about Valentine's Day.  It was a six day trip but took me over a month to write about it!

In the meantime, we have begun a major repair project for the apartment.  About fifteen months ago when we arrived in early January of 2024 we found the kitchen ceiling, powder room ceiling and a few other areas in a state of disaster due to water damage from the apartment above us.  Details are in last years blog posts here and here. 

To summarize the situation as we found it fifteen months ago: Large portions of the heavy plaster crown molding had separated and fallen to the floor in our kitchen, powder room and hallway that leads to the bedrooms.  Peeling paint and plaster were falling regularly from the ceiling in those areas.

Our upstairs neighbor, I'll call him Richard - or Dick for short - was the source of the water.  He had inherited the apartment from his father, I'll call him Big Dick.  Big Dick had reluctantly dealt with water leakage about seven years ago.  We refinished the kitchen ceiling at that time and repainted our apartment.  

Here is what our situation looked like in January, 2024.

PowderRooLight-1    Leak-20240111-2

The worst of our recessed kitchen lights (only seven years old) since replacement following Big Dick's first water fiasco, looked like this:

LeakRepair-250323-16

 

With encouragement from friends, we sought legal help.  We contacted a lawyer in the neighborhood who assured us that he could bring a successful legal case.  He had a nice, if not elaborate, office.

Lawyer1-1 

Within a few weeks he had successfully served papers on Dick and a police inspection of the properties would be scheduled.  Our lawyer visited us twice at our apartment and we completed this phase for a grand total of about one hundred dollars in legal fees.

Alas, nothing seemed to happen over the next ten months, in spite of the tempting promise of another hundred dollars in legal fees for some results.

In the meantime, an informal committee of concerned building residents (three of us) and a building contractor, visited Dick's apartment and pecked away with a hammer at some obvious loose tiles and potential sources for the water.

ConcernedResidents-1

We carefully reviewed both of Dick's bathrooms and concluded that the floors likely needed to be torn up, proper water barriers installed and new floors laid. There was no membrane under the tile floor.

Since nothing had taken place on the legal front by the time we arrived this January, despite our lawyer telling us that we had a court date in November, we took the advice of another friend and sought legal help from another lawyer on the other side of the river in downtown Cairo.

He had a much larger office.  With a lobby! We were beginning to think that this lawyer would be a little more costly than the previous one.

Lawyer2-1

 

Lawyer number two wanted three thousand dollars up front but said we had a very good case.

Well, this is Egypt.  For three thousand dollars I should be able to repair four or five kitchens AND bathrooms.

A couple of days later, it began to rain in our kitchen.  Linda put out all the pots and pans we own as water was pouring out of the recessed ceiling lights!  Towels were put down to catch other drips - we collected over a gallon of water in the pots in the next hour.

Leak-20250128-1

 

We dashed up to the next floor to confront Dick - he was just leaving his apartment, to go to his gym, no less.  We asked him to come into our kitchen to see the damage. He was very sorry. "Sorry" doesn't solve or fix the problem.

 It turns out that the problem was not with the floor of Dick's bathrooms; water was pouring through the floor of the disaster area called "his kitchen".

Leak-20250128-2

 

At some point, Big Dick had installed a tank for potable water in the kitchen.  The faucet from it was leaking - as was the faucet for the "city water" in the kitchen.  The water from the first leaky faucet was caught in a jar, the size of a Vlasic pickle jar.  The granite countertop surrounding the sink was broken in half so all leaking water ran down through the cabinet holding the sink - which, by now, had a totally rotted out floor.  A large 5 gallon bucket (think Home Depot bucket size), filled to overflowing, was presumably there to catch the leaking water.  Tip or spill any of the containers - or just neglect the containers - and the water fell to Dick's floor, ran to cracks, leaked along iron re-bar and onto the iron hooks holding our suspended ceiling before seeking an exit at our light fixtures.  Like the river Nile, the water wore its own channels through everything in its path until reaching our kitchen floor. We also had rivulets running down our wall tile from our ceiling to the floor.

With the help of friends, we negotiated a solution.  Dick would hire a plumber/fixer to redo his kitchen plumbing and cabinetry.  We would contribute some cash to make it happen immediately.  In the end, a very good repair job was done; new granite, a "catch basin" surrounding the sink, new plumbing.  There was even a re-grout and seal of the master bath floor just in case any water was coming from there.  It took about three days.  After carefully watching the repairman, I am confident that any water dispensed in Dick's kitchen will now go into the sewer drain instead of our apartment.

Dick was on his own to buy the new granite countertop.  We paid half of all the rest - our share came to $68.

Now, we just had to wait for things to dry out and consider how we would repair our damage.  We considered the possibility of returning to Cairo for a couple of weeks in the fall to supervise a remodeling job.  When our friend heard this idea he replied, "Why spend your money for a ticket? We can do it now." He called a so-called engineer (anyone with the least bit of technical skills is called an engineer) who came to our house to assess the situation. Yes, he could repair it in just five days. Our friend negotiated a price that for us was satisfactory. We knew, of course, that it would take longer than five days but we still had enough time so we gave the OK for the project to begin. We realistically figured that the five days quoted was more like about ten days in real time; but we still had fifteen days before we left. Project start date = March 20, 2025. By the 20th it was changed to the 22nd. Before starting we're two days behind. OK, let's begin.

The project.

  • Tear out and replace current dropped ceiling in the kitchen
  • Add a new dropped ceiling in the powder room (with lights)
  • Repair all loose plaster in hall ceiling and walls
  • Repair other plaster with water damage
  • Repair numerous cracks that have appeared over the years (not water damage related)
  • Install new crown molding in affected areas
  • Repaint all walls and ceilings throughout

That's a big job; cost will run six to eight hundred dollars.

Finally the day came and the workers showed up and began demolition and paint preparation, (45 minutes late). We're off to a good start??   We moved everything we would need for living into our bedroom -the microwave, coffee maker and electric tea pot.  We covered all the furniture with plastic and crammed it into the living room. We referred to it as camping inside our apartment.

Batch2-09    Batch2-01

 

Day 1 "First, prepare the surface," that innocent sounding first instruction on every can of paint got underway.

LeakRepair-250323-04    LeakRepair-250323-07

 

I should point out that we don't actually have plaster walls.  Interior construction here consists of a layer of special "white cement" over the bricks that form walls. The painters used a special "putty" form of cement to fill cracks and holes.

LeakRepair-250323-02

 

 

Day 2  Demolition of the suspended dropped ceiling soon revealed a big surprise.  Our kitchen ceiling was disintegrating as the many years of leaking water had rusted through the re-bar and the bottom two inches of concrete was separating from the re-bar!  Dick has a problem - he and his mother (Dick is single at age 30 and lives with his mother) may soon fall through their floor and into our kitchen. What a surprise that would be for them (but not for us).

LeakRepair-250323-06    LeakRepair-250323-08

It is amazing to see the damage that leaking water can do to structural iron bars.

LeakRepair-250323-09

 

Dilemma: should we just patch it up and hide it with some epoxy or do a proper repair?  This is likely a big-money fix. Fortunately for us our downstairs neighbor is very well versed in construction so we called on him to take a look at our project. With alarm in his voice he immediately determined that our original plan was not sufficient to proceed. He knows a REAL engineer who can come and assess the situation but not until after Ramadan. This effectively puts our remodel on hold until after the imminent arrival of the big Eid el Fitr Holiday.

Day 3  Nobody showed up and nobody called to tell us the reason. Are you sure this is a five day project?

Day 4  Sheet rock installation in the powder room.

Day 5 An electrician came to install two recessed lights in the powder room. That's more light than previous and no shadows now.  He also installed two temporary lights in the kitchen so we can see enough for some light food preparation.   

Batch3-4    IMG_9757

 

We do not regret starting the project before leaving because now we have a good idea of what will happen in our absence. We will have to trust our friends to supervise the final repairs and finishing work.  We'll keep in contact via messenger, voice and photos, along the way. We have faith that it will all turn out well but wonder, "what will this cost - and will Dick end up paying for the damage?"  

Watch this space for the final  chapter to the story, next January!

 

 

 

 

 

 

Monday, February 3, 2025

New Windows for the Cairo Condo

Last year, we installed a new door to the front balcony. It worked so well at reducing traffic noise from the Ring Road that we decided to replace the two windows on the same side of the apartment with similar technology.

We contacted our window contractor, Mr. Ramadan, who came to measure the openings on a Thursday night.  While the old units are "sliders" which work well for easy opening, we almost never open them.  The cold air, noise and dust leaks in around the edges of these units.Windows-2

 

The new units swing inward to open but seal very tightly and have triple-pane glass.  They arrived with a protective plastic coating on the frames.Windows-3


We agreed on a price and I paid a three-quarters deposit.  A week later Mr. Ramadan called to tell us that the new custom made units were ready and we scheduled the installation for the following night.

He arrived with his two assistants and they went right to work, removing the old window near my office area.
Windows-1
 

The procedure for each window is to drill anchor holes in the frame, fasten the window unit in place with screws, use foam sealant around the exterior of the unit and then seal the interior with silicon caulk.

The hardest part of the job is to seal the outside with spray foam. This is a two-man job. The young man with the yellow hat does the actual sealing. Since we are on the eighth floor, the job of the second man is to hold on to the belt of the first man so that he doesn't fall out. It's important to stay on friendly terms with your assistant.
Windows-4
 

After about an hour and a half, with the job complete, we all had tea and I counted out the remainder of the cash.  Price for the two window units was 16,000 EGP - about $320 - with three-quarters of that paid in advance.

The crew did a nice job of cleaning up (OUR broom, glass cleaner and rags, of course) and left the two old window units by the front, door while Mr. Ramadan supervised and I took his picture 

Windows-5    Windows-6  

 

While the windows hold out any cold air and dust, the principal advantage is noise reduction. We can now easily carry on a conversation between rooms. They do all that and add some personality to the room.

Windows-7
 

Later, the" rubabekia" (junk man) picked up the windows and gave me 1500 EGP for them, bringing the total cost of the project down to around $290. A real bargain in our eyes.




Sunday, March 20, 2022

Repairing the Tile, Egyptian Style

It turns out that we did not use any of the newly purchased tile described in the previous post.  Gentle prying around the edge of the loosest tile released it with no damage.  A neighboring tile was easily removed also.

Our tile setter arrived on Friday afternoon, just after prayers, as shops around our area were reopening.  We headed first to this cement store.

IMG_7651edited1


It wasn't until I looked at the photo that I noticed that the shop is nestled into a small open spot next to a neighborhood mosque.  This shop caters to the low volume customer and is happy to break down mortar and grout by the kilogram.  We picked up  bags of mortar, brown sand and grout (known locally as "white cement."

IMG_7652edited1 IMG_7660edited1


Our next stop was a small paint and hardware outlet where we purchased a plastic tarp.

IMG_7655edited1   IMG_7659edited1


The final stop was at a "plastic shop" where we bought a tub suitable for mixing mortar.  All told, I was in for about ten dollars at this point.

 I was unsure why we needed the brown sand.  It turns out that I had missed something during my previous visits to construction sites.  I usually have looked closely at the basic framing of the buildings along with electrical and plumbing work without inspecting the tile installation.  (You can click on the "construction" tag on this post to see all my previous posts on the subject.)   Notice the pile of sand on the floor at this work site below.

BeverlyHills-05


Now, you can google "ceramic tile," thinset, thickset and any number of related terms but you will not find a step in the process that says, "spread a bed of sand about two inches thick on the floor, before beginning."  As always, we  say, "Everything is different in Egypt." - and it truly is.

Chipping away the 3/4 inch of mortar beneath our tiles revealed our bed of brown sand.  Obviously, some shifting had taken place.  This was a great revelation to me.  I have long wondered how cracks could appear in the tile floors of relatively new buildings, such as the new Museum of Egyptian Civilization;  I now understand.

With loose tiles popped off, and the mortar chipped out, our man was now able to level out our sand bed and layer in a new mortar bed.  He mixed the mortar out on the balcony in a basin and mixing ring that he had supplied, using water from the newly purchased tub.

IMG_7664edited1  IMG_7669edited1


After replacing four tiles, it was time for tea; then grout was applied to the tile gaps. This guy must be somewhat of a perfectionist, an unusual thing in Egypt, as experienced by us. He just couldn't help himself so he also filled some other gaps in the original improperly grouted tiles.  The result seems fine both physically and aesthetically.  

IMG_7674edited1   IMG_7672edited1

 

Our installer asked for 250 EGP (about $16) for his afternoon's work.  I tipped generously but kept the plastic tub.  We disposed of the tarp and old mortar in traditional Egyptian fashion. It was thrown over a fence into a vacant lot. Perhaps someday someone else will have to deal with it.

More photos at this Flickr album.

 







Saturday, March 19, 2022

Shopping for Floor Tile

This year, we noticed a few loose pieces of ceramic tile on the floor of our condo.  One, in particular, was actually rocking and crunching in our bedroom.  We sought a professional opinion from a tile-setter who confirmed that we had a problem.

He hoped that we might have a few extra tiles in storage since removing the loose one could result in chipping or breaking.  We had none.  So, we spent an afternoon looking for a match.

This took us first to "tile street," in the heart of commercial Giza.  Businesses here tend to gather by type and a full couple of blocks of tile vendors can be found across the street from plumbing fixture shops.  With very limited display space, the street is utilized as a showroom.  

The line of toilets, sinks and bathtubs lying on the street is a bit jarring - so much so that I completely missed a great photo opportunity: a young woman covered head to toe in a niqab departing the area carrying a stainless steel kitchen sink under her right arm,

IMG_7556edited1   IMG_7553edited1

Doesn't everyone buy their new toilet on the street? These fixtures seem to be smiling.
IMG_7550edited1

 

Linda checked out the displays in several of the small tile shops.

IMG_7554edited1   IMG_7555edited1

 

It turns out that our biggest problem was not matching the color or pattern. We had a size issue.  When our apartment was constructed fifteen years ago, square tiles, 30 cm (about 12 inches) on a side was the norm.  Today, as back in the U.S., tile is larger - 30x60, 30x90, 60x60 are all the modern style.  30x30 tiles were not to be found on "tile street."

Clued in by one of the shop owners, we headed down to the high-rent district along the banks of the Nile.  The stores here were of an entirely different character - as upscale as any design studio you might encounter in Edina or Woodbury back home.  We visited two of them.

IMG_7557edited1  IMG_7561edited1

 

Sliding panels of tiles lined a long hallway near massive displays of shower heads and faucets.  

IMG_7558edited1  IMG_7560edited1


Mahgoub (since 1948) has anything you could imagine in tile and fixtures.  They also had a small army of salesmen in suit and tie to show us around.  We soon located a selection of "old-fashioned" 30x30 tiles and were able to order a minimum package of ten tiles that looked to be a good match to our floor.

IMG_7559edited1

 

Here is the new tile placed on the left side of this photo. It's a perfect match with the old tile on the right.

IMG_7675edited1

 

It was an interesting afternoon exploring the resources available to the various strata of society.  Of course, tea is offered to the customer, no matter which store you visit.

 

 

 

 

 

 

 

 

 

Monday, January 28, 2019

About Those Red Brick Buildings

One of the most distinctive features of the Cairo landscape is the red brick apartment building of about ten floors or more.  We have become so used to them that we don't really notice their presence while moving about the city.  When we are with newcomers to the area, we do get questions:
"Why don't they finish the buildings?
"What happened to all of the buildings?"
"Was there a war here?"


EgyptBrick-1-1

Apparently, the appearance even bothers President el-Sisi.   About two weeks ago, he ordered that the buildings should be painted.
In an attempt to turn Egypt more visually appealing, Egypt’s President Abdel-Fattah El-Sisi released a order for all redbrick buildings in the country to be furbished and painted according to a color scheme.

On 17 January, state-owned Al-Ahram Arabic said that Mostafa Madbouly, Egypt’s Prime Minister, gathered with Egypt’s governors and highlighted that “Egypt’s ubiquitous red brick buildings convey an ‘uncivilised’ image [of the country].”

Madbouly warned that if each governor does not follow through with the project, there will be legal consequences.
 I now have a bet with a friend that my president will get his wall built before his president gets his bricks painted!

The redbrick construction is characteristic of what is known here to the academic and government community as the "informal settlements."  These are areas that have sprung up without architects, formal planning and even such formalities as building codes and inspections.   By some estimates, "nearly two thirds of Greater Cairo Region's population are living in informal urban settlements, and the number is expected to continuously increase."

The architectural and urban planning communities have gone so far as to hold a three-day seminar here a few years back titled "Learning from Cairo."   According to an article on the Arch Daily website, "... informal modes of development can no longer be ignored nor labeled as something to be tolerated until they can be removed."

Meanwhile, if you would like to study the subject yourself, just click on the construction tag beneath this post and take a tour of my previous blog posts on the subject.  Keep in mind that this is all it takes to build your own high-rise in Cairo.
Bricks


construction-1




Saturday, January 26, 2019

Construction in Progress - 2019

When I went to bed late last night, I noticed one of the familiar sounds of Cairo.  "Varoooooooom" - a few seconds pause, then "Varoooooooom."  A sure sign of new construction.

I showed you the details of interior construction just about four years ago in this blog post.  There I featured the rough shell of apartment buildings that look like this as they rise about 8 to 12 stories in the air.
CIP-09

The interior surfaces are finished with a sand/cement mixture to form smooth surfaces and the floors covered with ceramic tile.
CIP-06

But how does all of that sand and cement get to the higher floors?  There is no freight elevator.  A construction crew working on, say, the fifth floor sets up a baby crane on the balcony (almost all apartments have a balcony) and lowers a bucket to a crew at street level who load up the bucket.  Up goes the bucket, out pours the sand.  Repeat. Repeat. Repeat.

When I woke up this morning, the crew was still moving sand so I made a video.  Click on the triangle in the center to play it. The five-man crew has this process running very smoothly.


Thursday night is an ideal time to begin this sort of work on a busy street.  This is the beginning of the weekend and there will be no traffic on Friday morning to cause problems.